On Friday, October 9 at 10 a.m., Palmdale breaks ground on Phase 1 of the Chimbole Center renovation at 38350 Sierra Highway. The building has been closed since a fire in December 2022. Members of the City Council and Congressman George Whitesides will lead the ceremony. Whitesides helped secure a $2 million federal earmark for the work.
For anyone who has tried to book a room for a large family party, a fundraiser or a community meeting since then, the building's size matters most. Plans for the renovated center call for activity spaces and flexible rooms that can hold groups from six to 500, along with outdoor gathering areas. Right now, nothing the City rents comes close to that range. And the one venue built for crowds larger than that may be about to take its own break.
Nearly Four Years Dark
The fire started around 4 a.m. on Monday, December 26, 2022, on the building's second floor. Los Angeles County Fire Engine 137 responded, and the fire captain told AV Daily News an outside source had set an artificial Christmas tree alight. A suspect was arrested for arson and burglary. At the time, the cost of the fire and water damage had not been determined. The City said the center would stay closed until further notice and that staff would start calling people with booked events on January 3.
That closure has lasted almost four years. "The Chimbole Center holds special memories for so many people in Palmdale, and its absence has been deeply felt," Mayor Eric Ohlsen said in the City's October 2 announcement.
The building dates to 1987. It is named for Larry Chimbole, Palmdale's first mayor, who helped lead the City's incorporation in 1962. The Palmdale City Library next door opened in 1977 as the City's first municipal building. The renovation will tie the two buildings together.
What Phase 1 Actually Builds
The centerpiece is a two-level glass concourse. It connects the center to a new main entrance for the library. When the City Council approved construction management for the project in June, the Antelope Valley Press reported that part of the library would be partially demolished to create that entrance.
The rest of the work list centers on hosting events:
- The ballroom gets movable partitions, so one large hall can split into smaller rooms.
- The kitchen gets warming equipment.
- The rooms get new audiovisual systems.
- The building gets a new roof and new heating, cooling, electrical and plumbing systems, plus upgraded fire alarm and security systems.
- The grounds get accessibility, parking and lighting improvements. The parking lot is being reconfigured.
Icon West, Inc. holds the construction contract at about $26.7 million. A 15% contingency brings the authorized amount to about $30.7 million. The money comes from the General Fund, Measure AV, the American Rescue Plan Act and federal earmarks. Cumming Management Group, Inc. will manage construction under a separate agreement of up to $988,000.
The City estimates 360 working days of construction, counted from its Notice to Proceed. Working days don't include weekends or holidays, and the City has not announced the start date for that count. So no reopening date has been published.
The Rooms You Can Book Today
Chimbole doesn't appear in the City's online reservation system, which currently lists 17 rentable spaces. These are the largest options available while it's closed:
| Space | Address | Listed capacity |
|---|---|---|
| Legacy Park Lawn, Legacy Commons | 930 E. Avenue Q-9 | 250 |
| Picnic Pavilion, Desert Sands Park | 39117 3rd Street E | 200 |
| Legacy Auditorium, Legacy Commons | 930 E. Avenue Q-9 | 110 |
| Dining Hall, Legacy Commons | 930 E. Avenue Q-9 | 110 |
| Activity Room #1, Desert Sands Park | 39117 3rd Street E | 85 maximum occupancy |
| Activity Rooms #1–3, Marie Kerr Park Recreation Center | 2723-A Rancho Vista Boulevard | 30 each in the booking system |
| Activity Rooms #1–3, Palmdale Oasis Park Recreation Center | 3850 E. Avenue S | 30 each in the booking system |
There's one detail to check on the Marie Kerr and Oasis rooms. The City's facility pages list a maximum occupancy of 40 for each room and say the rooms can be set up as one, two or three separate spaces. The booking system lists 30. Confirm with the City which number applies to your event before you send out invitations.
The table shows the gap. The biggest indoor rooms on the list hold 110, and the biggest outdoor space holds 250. The planned Chimbole tops out at 500. Nothing the City rents today falls between those numbers.
The Venue That Starts at 1,000
The next step up in City-run space is much bigger. The Palmdale Amphitheater rents for public or private events expecting 1,000 guests or more, with seating layouts for 1,000, 2,000 and 3,000. Its rental page says events expected to draw fewer than 1,000 people are handled at other park sites. The same page says the Amphitheater is tentatively scheduled to close from fall 2026 through spring 2027 for parking lot construction.
That closure is tentative, and the page doesn't give exact dates. But it puts both of the City's large-crowd venues out of service in the same season. Chimbole is designed for gatherings in the low hundreds, and the Amphitheater for crowds in the thousands. If the Amphitheater schedule holds, the Legacy Commons lawn, the Desert Sands pavilion and the smaller park rooms will carry most of Palmdale's civic gatherings this winter.
October at the Amphitheater
That makes this month's Amphitheater calendar worth planning around. The festival sponsors' logos mark this as the Amphitheater's 20th season.
- Gabriel "Fluffy" Iglesias, Friday, October 9, 8 to 10 p.m. This is the same day as the Chimbole groundbreaking that morning.
- Kaleidoscope Fall Frenzy, the City's biggest festival of the year, runs Friday, October 16 from 6 to 10 p.m. and Saturday, October 17 from 1 to 9 p.m. Its lineup includes free kids' activities, vendors, live art, entertainment and food and drink.
- Making Strides Against Breast Cancer Walk, Saturday, October 24, 7 to 10 a.m.
All three take place at 2723 Rancho Vista Blvd.
Smaller Gatherings Are Already on the Calendar
The City's October schedule already leans on parks and community rooms, which is where gatherings will land if the Amphitheater closes. A free drive-through pet microchip clinic runs Saturday, October 10, from 9 to 11 a.m. at Poncitlán Square, 38315 9th St. E. The free Paws in the Park "Howl-O-Ween" Dog Costume Contest takes over Sam Yellen Dog Park, 5100 East Avenue S, on Thursday, October 29, from 4:30 to 7:30 p.m. Teens have a Costume Hangout Night on October 9 and a Teen Friendsgiving on November 24. Both are held at the Sam Yellen Park and Marie Kerr Park community buildings.
The library next to the construction site still lists regular hours at 700 E. Palmdale Blvd.: Monday through Thursday 10 a.m. to 8 p.m., Friday and Saturday 10 a.m. to 5 p.m., and Sunday 1 to 5 p.m. Its October calendar includes Family Storytime and Movie Wednesdays on October 7, Bilingual Storytime on October 8, and Coffee & Coloring and a Volunteer Orientation on October 13. With part of the library slated for demolition and the parking lot being reconfigured, check the City's capital projects page or call Public Works at 661-267-5300 before planning a visit around the work zone.
After Phase 1
The project doesn't end when the center reopens. When the Council reviewed initial redesigns, the plan was to merge the center and library into one building, using the space between them and expanding into the current fountain area. Phase 2 will renovate the library, and the library will temporarily use parts of the Chimbole building while that work is underway. The Council also asked that the exterior keep the character and cultural significance of the existing Chimbole Center. That means the first big parties in the rebuilt ballroom could share the building with the library for a while.
"This investment will make the Center more accessible and adaptable to the many ways our residents use it," said Mayor Pro Tem Austin Bishop.
Our families have celebrated at the Chimbole Center too, and the team at Momentum Real Estate Group will keep following the rebuild until the ballroom doors open again. If you live near Sierra Highway and want to know how a major civic project down the street affects your home's value, start with a free home valuation. We'll walk you through it in English or Spanish.